Needs for power generators

published 16 October 2022 14:38

As a result of the attacks of the Russian Federation on the energy infrastructure of Ukraine and taking into consideration the risks of such attacks in future, there is a need to provide backup power supply systems, in particular diesel generators.

Even in normal, peace conditions, the consistency of the technological processes is critical for functioning and manufacturing of agricultural production. Operation of elevators, irrigation systems, cooling for storage of finished products, technological lines for livestock breeding, processing of products - each branch of agriculture depends on a reliable source of electricity.

In total, the need for diesel generators in the agricultural sector of Ukraine is 1,133 units  for the cost of USD 51 million (2 143 million UAH)[1], with the details stipulated below.


[1] The exchange rate is 1 USD = 42 UAH

Needs for generators download in pdf


The total demand for diesel generators in the livestock sector is 493 units for the total cost of USD 16,12 million, including:

• in cattle breeding - 163 units for the total cost of USD 2,79 million;

• in pig breeding - 53 units for the total cost of USD 1,42 million;

• in poultry farming - 277 units for the total cost of USD 11,91 million.

It is necessary to provide medium and small livestock farms with diesel generators in order to ensure their uninterrupted and productive operation (in cattle breeding: milking rooms, maternity sections; in pig breeding: functioning of premises for keeping sows with suckling piglets; in poultry breeding: functioning of premises for keeping poultry of meat or egg breeds, as well as incubators).

The lack of electricity at the farms will result in the ventilation system failure, death of newborn livestock, impossibility of prompt maintenance of milking rooms what in its turn can result in such disease as dairy cow mastitis.

No

Capacity kW

Price

 for 1 pc. (VAT included) 

in USD

Animal breeding fields

 

 

Cattle breeding
pcs

 

Cost, UAH

 

Cost, USD

 

Pig breedingpcs

 

Cost, UAH

 

Cost, USD

 

Poultry farming
pcs

 

Cost, UAH

 

Cost, USD

 

Total, pcs

 

 

Total cost USD (UAH)

1

9 kW

3 001


0

0


0

0

3

378 108

9 003

3

9 003 (378 108)

2

10 kW

3 143


0

0

1

132 000

3 143


0

0

1

3 143 (132 000)

3

12 kW

2 858


0

0


0

0

3

360 105

8 574

3

8 574 (360 105)

4

15 kW

5 714

1

240 000

5 714

1

240 000

5 714


0

0

2

11 429 (480 000)

5

20 kW

7 664

1

321 900

7 664

0

0

0

1

321 900

7 664

2

15 329 (643 800)

6

25 kW

8 333


0

0


0

0


0

0

0

0

7

40 kW

7 236


0

0

1

303 900

7 236

3

911 700

21 707

4

28 943 (1 215 600)

8

50 kW

9 779

20

8 214 000

195 571

6

2 464 200

58 671

3

1 232 100

29 336

29

283 579 (11 910 300)

9

55 kW

13 571


0

0


0

0


0

0

0

0

10

60 kW

13 479


0

0

2

1 132 200

26 957

12

6 793 200

161 743

14

188 700 (7 925 400)

11

65 kW

13 571


0

0


0

0


0

0

0

0

12

70 kW

11 905

50

25 000 000

595 238

1

500 000

11 905


0

0

51

607 143 (25 500 000)

13

75 kW

15 238


0

0

2

1 280 000

30 476


0

0

2

30 476 (1 280 000)

14

80 kW

15 952


0

0

3

2 010 000

47 857


0

0

3

47 857 (2 010 000)

15

90 kW

16 386


0

0

1

688 200

16 386


0

0

1

16 386 (688 200)

16

100 kW

20 732

51

44 407 128

1 057 313

2

1 741 456

41 463

51

44 407 128

1 057 313

104

2 156 088 (90 555712)

17

120 kW

19 867


0

0

4

3 337 728

79 470

6

5 006 592

119 205

10

198 674 (8 344 320)

18

120-140 kW

19 867


0

0

1

834 432

19 867


0

0

1

19 867 (834 432)

19

150 kW

20 086

30

25 308 000

602 571

2

1 687 200

40 171


0

0

32

642 743 (26 995 200)

20

160 kW

35 463


0

0

3

4 468 365

106 390

18

26 810 190

638 338

21

744 728 (31 278 555)

21

180 kW

32 857


0

0


0

0


0

0

0

0

22

200 kW

32 143

10

13 500 000

321 429

9

12 150 000

289 286

33

44 550 000

1 060 714

52

1 671 429 (70200 000)

23

220 kW

32 629


0

0

5

6 852 110

163 145

6

8 222 532

195 775

11

358 920 (15 074 642)

24

250 kW

28 571


0

0


0

0


0

0

0

0

25

280 kW

27 393


0

0

1

1 150 500

27 393

15

17 257 500

410 893

16

438 286 (18 408 000)

26

300 kW

37 500


0

0


0

0

15

23 624 865

562 497

15

562 497 (23 624 865)

27

325 kW

44 945


0

0

1

1 887 708

44 945


0

0

1

44 945 (1 887 708)

28

327 kW

44 945


0

0


0

0

6

11 326 248

269 673

6

269 673 (11 326 248)

29

340 kW

40 503


0

0

1

1 701 130

40 503


0

0

1

40 503 (1 701 130)

30

350 kW

40 503


0

0

3

5 103 390

121 509


0

0

3

121 509 (5 103 390)

31

360 kW

43 033


0

0


0

0

18

32 532 840

774 591

18

774 591 (32 532 840)

32

400 kW

47 814


0

0

1

2 008 200

47 814

33

66 270 600

1 577 871

34

1 625 686 (68278800)

33

420 kW

42 857


0

0


0

0

3

5 400 000

128 571

3

128 571 (5 400 000)

34

450 kW

59 524


0

0


0

0


0

0

0

0

35

480 kW

62 159


0

0


0

0

3

7 831 980

186 476

3

186 476 (7 831 980)

36

500 kW

83 333


0

0

1

3 500 000

83 333

9

31 500 000

750 000

10

833 333 (35 000 000)

37

600 kW

100 000


0

0


0

0

24

100 800 000

2 400 000

24

2 400 000(100800000)

38

630 kW

109 524


0

0


0

0

3

13 800 000

328 571

3

328 571 (13 800 000)

39

650 kW

111 905


0

0

1

4 700 000

111 905


0

0

1

111 905 (4 700 000)

40

700 kW

123 810


0

0


0

0

3

15 600 000

371 429

3

371 429 (15 600 000)

41

1000 kW

140 207


0

0


0

0

6

35 332 230

841 244

6

841 244 (35 332 230)

42

1500 kW

180 355


0

0


0

0


0

0

0

0

43

1600 kW

193 544


0

0


0

0


0

0

0

0

 

 

44

 

Total:


163

116 991 028

2 785 501

53

59 872 719

1 425 541

277

500 269 818

11 911 186

493

16 122 22

(677 133 565)

Reference: Dependence of diesel generator power on the number of cows kept at the farm:

*up to 200 cows - 50 kW;

*200-500 cows - 70kW

*500-800 cows - 100kW

*800-1500 cows - 150kW

*1500-2500 cows - 200kW

*more than 2500 cows - 500-1000kW 

In the processing industry 254 units are required for the cost of USD 17,1 million, including:

• in dairy production - 72 units for the total cost of USD 5,85 million;

• in meat production - 12 units for the total cost of USD 0,97 million;

• in bread baking - 53 units for the total cost of USD 1,98 million;

• oil-and-fat industry - 28 units for the total cost of USD 3,02 million;

• sugar industry - 6 units for the total cost of USD 0,2 million;

• in other branches of the processing industry - 83 units for the total cost of USD 5,08 million.

Power outage during the technological production cycle will lead to financial losses for producers due to the loss of raw materials. A complete shutdown will make it impossible to produce food, and hence the shortage of these goods for the population will result in a humanitarian crisis.

No

Capacity kW

Price

for 1 pc. (VAT included)

in USD

Processing industry

Milk

Meat

 

Breadbaking

Oil-and-fat industry

Sugar industry

Others

Quantity, pcs

Cost, USD

Quantity, pcs

Cost, USD

Quantity, pcs

Cost,

USD

Quantity, pcs

Cost, USD

Quantity, pcs

Cost, USD

Quantity, pcs

Cost, USD

1

9 kW

3 001

0

0

0

0

0

0

0

0

0

0

0

0

2

10 kW

3 143

1

3 143

0

0

0

0

0

0

0

0

0

0

3

12 kW

2 858

0

0

0

0

0

0

0

0

0

0

0

0

4

15 kW

5 714

0

0

2

11 429

1

5 714

0

0

0

0

0

0

5

20 kW

7 664

0

0

0

0

10

76 643

0

0

0

0

5

38 321

6

25 kW

8 333

0

0

0

0

1

8 333

0

0

0

0

0

0

7

40 kW

7 236

0

0

0

0

1

7 236

2

14 471

0

0

1

7 236

8

50 kW

9 779

1

9 779

0

0

1

9 779

0

0

0

0

10

97 786

9

55 kW

13 571

0

0

0

0

0

0

0

0

0

0

0

0

10

60 kW

13 479

0

0

0

0

1

13 479

0

0

0

0

0

0

11

65 kW

13 571

0

0

0

0

1

13 571

0

0

0

0

0

0

12

70 kW

11 905

0

0

0

0

2

23 810

0

0

0

0

0

0

13

75 kW

15 238

2

30 476

0

0

0

0

0

0

0

0

2

30 476

14

80 kW

15 952

0

0

0

0

1

15 952

0

0

0

0

0

0

15

90 kW

16 386

1

16 386

0

0

0

0

0

0

0

0

0

0

16

100 kW

20 732

0

0

1

20 732

4

82 926

0

0

5

103 658

4

82 926

17

120 kW

19 867

0

0

0

0

2

39 735

0

0

0

0

0

0

18

120-140 kW

19 867

1

19 867

0

0

0

0

0

0

0

0

0

0

19

150 kW

20 086

1

20 086

0

0

3

60 257

0

0

0

0

3

60 257

20

160 kW

35 463

0

0

0

0

0

0

0

0

0

0

1

35 463

21

180 kW

32 857

0

0

0

0

0

0

0

0

0

0

1

32 857

22

200 kW

32 143

4

128 571

1

32 143

5

160 714

3

96 429

0

0

12

385 714

23

220 kW

32 629

0

0

0

0

0

0

0

0

0

0

0

0

24

250 kW

28 571

6

171 429

0

0

3

85 714

0

0

0

0

0

0

25

280 kW

27 393

0

0

0

0

0

0

0

0

0

0

0

0

26

300 kW

37 500

3

112 499

0

0

1

37 500

2

75 000

0

0

1

37 500

27

325 kW

44 945

1

44 945

0

0

0

0

0

0

0

0

0

0

28

327 kW

44 945

0

0

0

0

0

0

0

0

0

0

0

0

29

340 kW

40 503

0

0

0

0

0

0

0

0

0

0

0

0

30

350 kW

40 503

0

0

1

40 503

0

0

0

0

0

0

0

0

31

360 kW

43 033

0

0

0

0

0

0

0

0

0

0

0

0

32

400 kW

47 814

9

430 329

0

0

4

191 257

1

47 814

0

0

2

95 629

33

420 kW

42 857

0

0

0

0

0

0

0

0

0

0

0

0

34

450 kW

59 524

5

297 619

0

0

1

59 524

0

0

0

0

6

357 143

35

480 kW

62 159

0

0

0

0

0

0

0

0

0

0

0

0

36

500 kW

83 333

9

750 000

2

166 667

6

500 000

0

0

0

0

12

1 000 000

37

600 kW

100 000

4

400 000

0

0

1

100 000

0

0

1

100 000

10

1 000 000

38

630 kW

109 524

0

0

0

0

0

0

0

0

0

0

0

0

39

650 kW

111 905

0

0

0

0

0

0

0

0

0

0

0

0

40

700 kW

123 810

0

0

0

0

4

495 238

1

123 810

0

0

0

0

41

1000 kW

140 207

23

3 224 767

5

701 036

0

0

19

2 663 938

0

0

13

1 822 694

42

1500 kW

180 355

0

0

0

0

0

0

0

0

0

0

0

0

43

1600 kW

193 544

1

193 544

0

0

0

0

0

0

0

0

0

0

 

44

Total:


72

5 853 440

12

972 509

53

1 987 383

28

3 021 461

6

203 658

83

5 084 003

For the smooth operation of elevators 272 units are needed for the cost of USD 16,83 million.


The lack of electricity supply will lead to a complete shutdown of technological processes for grain processing and storage, which in turn will lead to its unsuitability for further use, including for feed purposes. Agricultural producers and elevators will suffer significant material and financial losses.

 

Elevators


No

Capacity kW

Price

for 1 pc. (VAT included) 

in USD

Quantity, pcs

Cost, UAH

Cost, USD

1

9 kW

3 001

0

0

0

2

10 kW

3 143

1

132 000

3 143

3

12 kW

2 858

0

0

0

4

15 kW

5 714

0

0

0

5

20 kW

7 664

5

1 609 500

38 321

6

25 kW

8 333

3

1 050 000

25 000

7

40 kW

7 236

0

0

0

8

50 kW

9 779

3

1 232 100

29 336

9

55 kW

13 571

0

0

0

10

60 kW

13 479

7

3 962 700

94 350

11

65 kW

13 571

12

6 840 000

162 857

12

70 kW

11 905

0

0

0

13

75 kW

15 238

0

0

0

14

80 kW

15 952

2

1 340 000

31 905

15

90 kW

16 386

0

0

0

16

100 kW

20 732

22

19 156 016

456 096

17

120 kW

19 867

0

0

0

18

120-140 kW

19 867

0

0

0

19

150 kW

20 086

3

2 530 800

60 257

20

160 kW

35 463

0

0

0

21

180 kW

32 857

1

1 380 000

32 857

22

200 kW

32 143

30

40 500 000

964 286

23

220 kW

32 629

1

1 370 422

32 629

24

250 kW

28 571

30

36 000 000

857 143

25

280 kW

27 393

0

0

0

26

300 kW

37 500

16

25 199 856

599 997

27

325 kW

44 945

0

0

0

28

327 kW

44 945

0

0

0

29

340 kW

40 503

0

0

0

30

350 kW

40 503

16

27 218 080

648 050

31

360 kW

43 033

0

0

0

32

400 kW

47 814

13

26 106 600

621 586

33

420 kW

42 857

0

0

0

34

450 kW

59 524

11

27 500 000

654 762

35

480 kW

62 159

0

0

0

36

500 kW

83 333

27

94 500 000

2 250 000

37

600 kW

100 000

19

79 800 000

1 900 000

38

630 kW

109 524

0

0

0

39

650 kW

111 905

0

0

0

40

700 kW

123 810

20

104 000 000

2 476 190

41

1000 kW

140 207

15

88 330 575

2 103 109

42

1500 kW

180 355

9

68 174 064

1 623 192

43

1600 kW

193 544

6

48 772 998

1 161 262

 

44

 

Total:

 

272

706 705 711

16 826 326

In the field of fish farming and aquaculture 65 units are needed for the cost of USD 0,56 million.

The lack of stable power supply to the production facilities of aquaculture facilities will result in inevitable negative consequences during critical periods such as autumn catch, winter maintenance and spawning campaign.

Autumn catch and boning is accompanied by the need for aeration of water and loading operations during the transfer of fish for winter maintenance, what is mainly carried out with the help of electric elevators.

Winter maintenance requires constant monitoring of the gas mode and its regulation by installing aerators, which are mostly powered from electric circuit.

The most sensitive to power outages is the spawning period, which almost always requires the use of pumps, aerators, water temperature control, etc.

The deenergizing to the incubation facility will result after few hours in the loss of all fish planting material and roe that stay in the facility.

Thus, the lack of a stable power supply at the fish farms can result in catastrophic consequences with the possible loss of fish planting material, commercial fish and brood stock. However, the availability of backup power supply (generators) will provide possibility to prevent such losses.

 

Fish farming and aquaculture


No

Capacity kW

Price

for 1 pc. (VAT included) in USD

Quantity, pcs

Cost, UAH

Cost, USD

1

9 kW

3 001

0

0

0

2

10 kW

3 143

0

0

0

3

12 kW

2 858

2

240 070

5 716

4

15 kW

5 714

0

0

0

5

20 kW

7 664

32

10 300 800

245 257

6

25 kW

8 333

0

0

0

7

40 kW

7 236

4

1 215 600

28 943

8

50 kW

9 779

24

9 856 800

234 686

9

55 kW

13 571

0

0

0

10

60 kW

13 479

1

566 100

13 479

11

65 kW

13 571

0

0

0

12

70 kW

11 905

1

500 000

11 905

13

75 kW

15 238

0

0

0

14

80 kW

15 952

0

0

0

15

90 kW

16 386

0

0

0

16

100 kW

20 732

0

0

0

17

120 kW

19 867

1

834 432

19 867

18

120-140 kW

19 867

0

0

0

19

150 kW

20 086

0

0

0

20

160 kW

35 463

0

0

0

21

180 kW

32 857

0

0

0

22

200 kW

32 143

0

0

0

23

220 kW

32 629

0

0

0

24

250 kW

28 571

0

0

0

25

280 kW

27 393

0

0

0

26

300 kW

37 500

0

0

0

27

325 kW

44 945

0

0

0

28

327 kW

44 945

0

0

0

29

340 kW

40 503

0

0

0

30

350 kW

40 503

0

0

0

31

360 kW

43 033

0

0

0

32

400 kW

47 814

0

0

0

33

420 kW

42 857

0

0

0

34

450 kW

59 524

0

0

0

35

480 kW

62 159

0

0

0

36

500 kW

83 333

0

0

0

37

600 kW

100 000

0

0

0

38

630 kW

109 524

0

0

0

39

650 kW

111 905

0

0

0

40

700 kW

123 810

0

0

0

41

1000 kW

140 207

0

0

0

42

1500 kW

180 355

0

0

0

43

1600 kW

193 544

0

0

0

 

44

 

Total:

 

65

23 513 802

559 852

To ensure the functioning of the central office of the Ministry of Agrarian Policy and Food of Ukraine 2 units are required the cost of USD 0,16 million.

The absence of stable power supply will result in malfunction and possible complete shutdown of the equipment in the building of the Ministry as well as the servers’ failure that ensure the safety of information and the electronic document flow.

 

Ministry of Agrarian Policy and Food of Ukraine

No

Capacity kW

Price

for 1 pc. (VAT included) in USD

Quantity, pcs

Cost, UAH

Cost, USD

1

9 kW

3 001

0

0

0

2

10 kW

3 143

0

0

0

3

12 kW

2 858

0

0

0

4

15 kW

5 714

0

0

0

5

20 kW

7 664

0

0

0

6

25 kW

8 333

0

0

0

7

40 kW

7 236

0

0

0

8

50 kW

9 779

0

0

0

9

55 kW

13 571

0

0

0

10

60 kW

13 479

0

0

0

11

65 kW

13 571

0

0

0

12

70 kW

11 905

0

0

0

13

75 kW

15 238

0

0

0

14

80 kW

15 952

0

0

0

15

90 kW

16 386

0

0

0

16

100 kW

20 732

0

0

0

17

120 kW

19 867

0

0

0

18

120-140 kW

19 867

0

0

0

19

150 kW

20 086

0

0

0

20

160 kW

35 463

0

0

0

21

180 kW

32 857

0

0

0

22

200 kW

32 143

1

1 350 000

32 143

23

220 kW

32 629

0

0

0

24

250 kW

28 571

0

0

0

25

280 kW

27 393

0

0

0

26

300 kW

37 500

0

0

0

27

325 kW

44 945

0

0

0

28

327 kW

44 945

0

0

0

29

340 kW

40 503

0

0

0

30

350 kW

40 503

0

0

0

31

360 kW

43 033

0

0

0

32

400 kW

47 814

0

0

0

33

420 kW

42 857

0

0

0

34

450 kW

59 524

0

0

0

35

480 kW

62 159

0

0

0

36

500 kW

83 333

0

0

0

37

600 kW

100 000

0

0

0

38

630 kW

109 524

0

0

0

39

650 kW

111 905

0

0

0

40

700 kW

123 810

1

5 200 000

123 810

41

1000 kW

140 207

0

0

0

42

1500 kW

180 355

0

0

0

43

1600 kW

193 544

0

0

0

 

44

 

Total:

 

2

6 550 000

155 952

To ensure the trouble-free operation of the Ukrainian Institute for Plant Variety Examination 26 units are required for the cost of USD 82,2 thousand.

The lack of stable power supply will stop the examination of new plant varieties and result in the impossibility of their official registration and issuance of patents. Agrarians will not receive new, high-productivity plant varieties, and the Institute will not have no possibility to accumulate database of the varieties on its servers, to perform qualification examination, in particular the transfer of data from research sites, their processing and preparation of expert statements, as well as to form of the State Register of Plant Varieties, which are suitable for distribution in Ukraine, the Register of Patents for Plant Varieties, the Register of Applications. Additionally, the stand-by power generators are needed to conduct a set of laboratory tests of qualification examination and storage of official samples in the long-term storage at below-zero temperatures.

To ensure the trouble-free operation of the State Enterprise "State Center for Certification and Expertise of Agricultural Products" 6 units are needed for the cost of USD 36,9 thousand.

The lack of stable electricity supply will lead to the termination of certification of agricultural seeds and planting material. It will also stop the supply of seeds to farmers inside the country, import and export of seeds, and possible disruption of sowing.

To ensure the trouble-free operation of the State Institution "Soil Protection Institute of Ukraine" 8 units are required for the cost of USD 63,4 thousand.

The failure of power supply will stop the process of soil monitoring on agricultural land for the quality of soil and its erosion safety, its contamination with heavy metals, radionuclides, residual amounts of pesticides and agrochemicals, other toxic substances of man-made and natural origin. There will be the discontinuation of process of agrochemical certification to determine the indicators of soil fertility and the level of their contamination with toxic substances, as well as monitoring of changes in these indicators as a result of economic activity. The process of determining the residual amount of pesticides, agrochemicals, heavy metals and radionuclides in products and raw materials, surface waters intended for agricultural use, as well as the process of determining the quality composition of mineral fertilizers is of paramount importance to provide stable yields by agricultural producers and ensure food security of the state under the condition of military aggression from the side of the Russian Federation.

To ensure the trouble-free operation of the Ukrainian Research Institute of Spirits and Food Biotechnology 1 unit is required for the cost of USD 7,2 thousand.

The lack of stable power supply will make it impossible to perform the main functions of the Institute.

There are 6 units of generators for the cost of USD 68,8 thousand are needed to ensure the trouble-free operation of the Ukrainian Research Institute of Forecasting and Testing of Equipment and Technologies for Agricultural Production named after Leonid Pogoriliy.

The lack of trouble-free electricity supply will make it impossible to perform the main functions of the institution, in particular it will suspend scientific and technical research, testing, analysis, evaluation and approval of machines (tractors, agricultural machinery for crop production, livestock, poultry and feed production, as well as means of mechanization, automation, engineering support for the agricultural sector) and technologies for agricultural production and training.

 

Ukrainian Institute for Plant Variety Examination


SE

Certification center


Soil Protection Institute

of Ukraine

Research Institute

of Spirits and Food Biotechnology

Research Institute named after L. Pogoriliy

 

No

Capacity kW

Price

for 1 pc. (VAT included)

in USD

Quantity, pcs

Cost, USD

(UAH)

Quantity, pcs

Cost, USD

(UAH)

Quantity, pcs

Cost, USD

(UAH)

Quantity, pcs

Cost, USD

(UAH)

Quantity, pcs

Cost, USD

(UAH)

1

9 kW

3 001

25

75 021

(3 150 900)


0,00


0,00


0,00


0,00

2

10 kW

3 143


0,00


0,00


0,00


0,00


0,00

3

12 kW

2 858


0,00


0,00


0,00


0,00


0,00

4

15 kW

5 714


0,00

5

28 570

(1 200 000)


0,00


0,00


0,00

5

20 kW

7 664


0,00


0,00

7

53 650,00

(2 253 300)


0,00


0,00

6

25 kW

8 333


0,00

1

8 333

(350 000)


0,00


0,00


0,00

7

40 kW

7 236

1

7 236 (303 900)


0,00


0,00

1

7 236

(303 900)

2

14 472

(607 800)

8

50 kW

9 779


0,00


0,00

1

9 779

(410 700)


0,00


0,00

9

55 kW

13 571


0,00


0,00


0,00


0,00

4

54 284

(2 280 000)

10

60 kW

13 479


0,00


0,00


0,00


0,00


0,00

11

65 kW

13 571


0,00


0,00


0,00


0,00


0,00

12

70 kW

11 905


0,00


0,00


0,00


0,00


0,00

13

75 kW

15 238


0,00


0,00


0,00


0,00


0,00

14

80 kW

15 952


0,00


0,00


0,00


0,00


0,00

15

90 kW

16 386


0,00


0,00


0,00


0,00


0,00

16

100 kW

20 732


0,00


0,00


0,00


0,00


0,00

17

120 kW

19 867


0,00


0,00


0,00


0,00


0,00

18

120-140 kW

19 867


0,00


0,00


0,00


0,00


0,00

19

150 kW

20 086


0,00


0,00


0,00


0,00


0,00

20

160 kW

35 463


0,00


0,00


0,00


0,00


0,00

21

180 kW

32 857


0,00


0,00


0,00


0,00


0,00

22

200 kW

32 143


0,00


0,00


0,00


0,00


0,00

23

220 kW

32 629


0,00


0,00


0,00


0,00


0,00

24

250 kW

28 571


0,00


0,00


0,00


0,00


0,00

25

280 kW

27 393


0,00


0,00


0,00


0,00


0,00

26

300 kW

37 500


0,00


0,00


0,00


0,00


0,00

27

325 kW

44 945


0,00


0,00


0,00


0,00


0,00

28

327 kW

44 945


0,00


0,00


0,00


0,00


0,00

29

340 kW

40 503


0,00


0,00


0,00


0,00


0,00

30

350 kW

40 503


0,00


0,00


0,00


0,00


0,00

31

360 kW

43 033


0,00


0,00


0,00


0,00


0,00

32

400 kW

47 814


0,00


0,00


0,00


0,00


0,00

33

420 kW

42 857


0,00


0,00


0,00


0,00


0,00

34

450 kW

59 524


0,00


0,00


0,00


0,00


0,00

35

480 kW

62 159


0,00


0,00


0,00


0,00


0,00

36

500 kW

83 333


0,00


0,00


0,00


0,00


0,00

37

600 kW

100 000


0,00


0,00


0,00


0,00


0,00

38

630 kW

109 524


0,00


0,00


0,00


0,00


0,00

39

650 kW

111 905


0,00


0,00


0,00


0,00


0,00

40

700 kW

123 810


0,00


0,00


0,00


0,00


0,00

41

1000 kW

140 207


0,00


0,00


0,00


0,00


0,00

42

1500 kW

180 355


0,00


0,00


0,00


0,00


0,00

43

1600 kW

193 544


0,00


0,00


0,00


0,00


0,00

 

44

 

Total:

 

 

26

 

82 257,00

(3 454 800)

6

36 903,00

(1 550 000)

8

63 429,00

(2 664 000)

1

7 236,00

(303 900)

6

68 756,00

(2 887 800)











































download in pdf

уву

Outdated Browser
Для комфортної роботи в Мережі потрібен сучасний браузер. Тут можна знайти останні версії.
Outdated Browser
Цей сайт призначений для комп'ютерів, але
ви можете вільно користуватися ним.
67.15%
людей використовує
цей браузер
Google Chrome
Доступно для
  • Windows
  • Mac OS
  • Linux
9.6%
людей використовує
цей браузер
Mozilla Firefox
Доступно для
  • Windows
  • Mac OS
  • Linux
4.5%
людей використовує
цей браузер
Microsoft Edge
Доступно для
  • Windows
  • Mac OS
3.15%
людей використовує
цей браузер
Доступно для
  • Windows
  • Mac OS
  • Linux